三泰虎11月24日译文,西部铁路公司(WR)准备了一个110亿卢比的计划,准备把孟买至艾哈迈达巴德这条印度最繁忙铁路走廊的旅行时间削减最少2小时。西部铁路公司计划把这条走廊的速度提高至160公里。为此,西部铁路公司将不得不升级铁轨,在易发生事故的地方设置围栏等。“整个过程需要一年时间完成。”一位高级官员说道:“一旦承包商确定,孟买至艾哈迈达巴德之间493公里走廊的基建升级工作将在5到6个月的时间完成。”

MUMBAI: The Western Railway (WR) has prepared a Rs 1,100 crore plan to reduce travel time between the city and Ahmedabad, the busiest Indian Railways corridor, by at least two hours. The WR has plans to increase the speed of some trains on the corridor to 160 kmph.

西部铁路公司(WR)准备了一个110亿卢比的计划,准备把孟买至艾哈迈达巴德这条印度最繁忙铁路走廊的旅行时间削减最少2小时。西部铁路公司计划把这条走廊的速度提高至160公里。

For this, the WR will have to undertake improvement of tracks, barricading of vulnerable locations and regulating the over head equipment (OHE), among other things.

为此,西部铁路公司将不得不升级铁轨,在易发生事故的地方设置围栏等

“We have submitted initial estimates for the speed improvement project to the railway board for approval,” WR chief public relations Sharat Chandrayan said.

If the initial estimates are approved, a detailed estimate will be prepared and tenders invited.

“我们已经向铁路局提交提速项目的初步概算以获得批准。”西部铁路公司的公关主管Sharat Chandrayan说道。

如果初步概算获得批准,详细的评估将会就绪,并发布招标邀请。

“The entire exercise can be completed in a year,” a senior official said. “We can complete the infrastructure improvement work on the 493 km corridor between Mumbai and Ahmedabad in five to six months after the contractors are appointed.”

“整个过程需要一年时间完成。”一位高级官员说道:“一旦承包商确定,孟买至艾哈迈达巴德之间493公里走廊的基建升级工作将在5到6个月的时间完成。”

以下是《印度时报》读者的评论:

译文来源:三泰虎 http://www.santaihu.com/2014112401.html[indent]

vandana lko ()

good but we need more on aerodynamic of these trains

不错,我们需要更多符合空气动力学的列车[/indent]

[indent]

A Varada Rajulu (Hyderabad)

In China, the high speed trains (not bullet trains but trains with track on concrete) run at a speed of initially 350 Kmph which take 3 hours and 15 minutes from Wuhan to Gaungzhou, a distance of 1050 Kilometers, with 2 stops. But after an accident, now the speed is reduced to 300 kmph. The problem is it requires separate tracks other than the normal ones as the high speed train tracks should have walls on both sides so that human beings or animals do not cross the track and to save the lives.

在中国,高铁的速度最初是350公里每小时,武汉到广州的距离是1050公里,中间停两站,全程跑完3小时15分钟。

发生动车事故后,速度降到了300公里每小时。

问题是高铁需要跑专线,为了避免人和动物的穿越,两边要围起来。[/indent]

[indent]

R Jayaraman (Chennai)

People will be happy if travel time is reduced.

旅行时间减少了,人们会高兴的[/indent]

[indent]

Murthy b (India)

Bringing all trains to 160 km level is the first step. It will be great if this can be done in one year .

把所有火车提速到160公里是第一步。能在一年内完成就最好了[/indent]

[indent]

G (Unknown)

simply put, India does not have infrastructure for high speed trains …also you cannot have trains running at 100kmph + with open doors, Windows like most of our trains

简单来说,印度并不具备能跑高铁的基础设施。

列车跑100公里的时速,车门和窗户是不能开着的[/indent][indent][indent]

Ruby B (Bengaluru)

Bullet trains will still be a dream for India.. It will take atleast 9-10 years to become a reality..

对印度来说,高铁仍将是一个梦想,至少需要9-10年才能成为现实[/indent]

[indent]

Ruby B (Bengaluru)

The whole infrastructure has to be changed.. Trains should run at speeds of more than 200kmph..

整个基础设施必须改变。列车应该跑200公里以上的时速[/indent]

[indent]

Venky ()

So that the other two hours can be spent in traffic jams.

另外两个小时就可以花在堵车上喽[/indent]

[indent]

raj rao (Bangalore)

Japanese will only do study. They will not get this project for execution as Chinese will bid it very low. Japanese can win this contract only by proposing latest technologies like 500 km/h trains.

日本人只是做研究。中国人将以很低的价格投标,他们是没法获得这个项目的执行的。

只有拿出500公里时速的最新技术来投标,否则日本人拿不到合同[/indent]

[indent]

raj rao (Bangalore)

Japan trains running using L0 series Shnkansen will cover this distance in less than 1 hours running at the speed of 500 km/h. This including stops in the middle.

日本的L0系列新干线的速度为500公里每小时,不到1个小时就能跑完这个距离,而且包括中间停站时间[/indent]

[indent]

thoma1820 ()

Will those tracks sustain that speed? I will let Modi and other ministers to take a few rides first.

铁轨承受得住那个速度吗?我会让莫迪和其他部长们先坐几次看看[/indent]

[indent]

Ashish Shah (Pune)

Interesting.. But those kind of trains should be implemented all over India to save the travel time especially between north and south India..

有趣,这种火车应该在全印度推广,以节省旅行时间,特别是节省南北长距离旅行的时间。

raj rao (Bangalore) replies to Ashis

If Railway minister approves the new Japanese Railway engines based on Maglev as the standard for India’s High Speed Railway network, then North Indians can go to the home in backend and come back to the office on Monday morning. But whether Modi and Railway minister approve 500 km/h trains as Standard for High Speed Railway in India.

如果铁道部长批准日本磁悬浮作为印度高铁网络的标准,那么北方人周末可以回到南方的家,然后周一早上赶回北方去上班。就是不知道莫迪和铁道部长是否会批准500公里时速的磁悬浮作为印度高铁的标准。

Ashish Shah replies to raj rao

Not so easy to have that high speed bullet trains as we dont have that kind of infrastructure.. Even if we get those bullet trains the numbers will be very limited..

高铁可没那么简单,我们没有那种基础设施来支撑。即便有了高铁,数量也会相当有限[/indent]

[indent]

King of India (Lexington)

Not impressive, but may be it is one step of the step by step process. I am waiting for the first bullet train in India @350KMPL Wow.

不咋地啊。不过一步步来嘛。我等着印度出现第一列跑350公里时速的高铁呢

raj rao (Bangalore) replies to King of India

But that needs a new railway line and new engines. Why not 500 km/h trains introduced by Japan recently. Why to use 50-year old technology of 350 km/h trains?

这需要铺设新的铁轨和引进新的列车。为什么不直接引进日本最近推荐的500公里时速列车。为什么要使用技术已经有50年历史的350公里时速高铁?

RamachandraRao Rao (Vizag) replies to King of India

You are day-dreaming a lot. Even your grand children may not see such trains.

你在做白日梦。就连你的孙子也看不到这么快的高铁

King of India replies to Ramachandrarao Rao

Just wait n watch

等着瞧[/indent][indent][indent]

prateek Modi (Jaipur, Rajasthan)

hope a better future for Indian railways…

希望印度铁路有一个美好的未来[/indent]

[indent]

madan mohan (mumbai)

Safety first – you do not see any stray animals or people on tracks in China or Japan they are all well protected not in India

安全第一。在中国和日本,你看不到人和流浪的动物在铁路上溜达,都是保护得好好的[/indent]

[indent]

r p mittal ()

In China the lowest speed band is 160 km to 220 km per hour. Semi high speed band is above 250 km per hour and highest speed band is 350 to 450 km/hour.

在中国,最慢的速度都有160-200公里每小时。半高铁的速度也超过250公里每小时,而真正的高铁都是飙到350-450公里每小时

RamachandraRao Rao (Vizag) replies to rpmittal50

A is A,, and B is B. A cannot be B or B cannot be A. A is India, and B is China

A是A,B是B,A没法成为B,B也没法成为A

A是印度,B是中国

shankar kare (Location) replies to Ramachandrarao Rao

if you go back to your elementary school your teacher will give you a star

你如果回到小学去,你的老师会给你一颗星的[/indent]

[indent]

Sumeet (Unknown)

not enough

还不够[/indent]

[indent]

Anirban Bandyopadhyay (India)

Why not use the 200 km/hr train that was tested in Agra?

为什么不采用在阿格拉试验的200公里时速的列车?[/indent]

[indent]

Rare Rational Indian (Mumbai)

Modi is not the PM of India but the PM for Gujarat

莫迪不是印度的总理,而是古吉拉特邦的总理[/indent]

[indent]

girishk2005 k (bangalpore)

India needs faster trains, no doubt, but safer ones are better for the time being. To cut travel time, the only option is to have double tracks everywhere so that the passengers need not wait for crossings.

印度需要更快的火车,这是毫无疑问的。但是此刻更需要的是安全的火车。为了减少旅行时间,唯一的选择是让全国各地的铁路双线化,减少交汇车的等待时间

Vishwa Kumar (Bengaluru) replies to girishk2005 k

yes i agree. most of the time is lost during crossing.

是的,我同意。大多数时间浪费在了交汇车的等待上[/indent]

[indent]

Manoj Kumar (Agra)

China runs at 450 KMPH and Japan at 550… where do we stand at 160KMPH future plans??

中国高铁时速450公里,日本高铁时速550公里。我们未来计划的160公里时速列车算是什么位置?

RamachandraRao Rao (Vizag) replies to Manoj Kumar

We stand first from the last.

倒数第一[/indent][/indent][/indent]

延伸阅读: 柴郡主 南洋姐 烛九阴
      打赏
      收藏文本
      5
      0
      2014/11/24 12:32:25

      热门回复

      • 军衔:陆军下士
      • 军号:4114732
      • 工分:826
      左箭头-小图标
      热回复背景

      开快了,车顶做不了人,阿三能把火车全堵在火车站。不尊重印度传统和印度人民意愿的行为必将受到印度人民的抵制,毕竟这里是民主国家么。

      2014/11/24 12:54:23

      网友回复

      左箭头-小图标

      China runs at 450 KMPH and Japan at 550… where do we stand at 160KMPH future plans??[ 转自铁血社区 http://bbs.tiexue.net/ ]

      中国高铁时速450公里,日本高铁时速550公里。我们未来计划的160公里时速列车算是什么位置?

      ==================

      日本的550只是个数字,运营时候最高速度也就300左右。

      2014/11/24 13:54:50
      • 军衔:陆军下士
      • 军号:4114732
      • 工分:826
      左箭头-小图标

      开快了,车顶做不了人,阿三能把火车全堵在火车站。不尊重印度传统和印度人民意愿的行为必将受到印度人民的抵制,毕竟这里是民主国家么。

      2014/11/24 12:54:23

      我要发帖

      总页数11页 [共有3条记录] 分页:

      1
       对印度最繁忙走廊将提速至160,印网民大谈高铁梦想回复